Automatic transfer switch follow up - Lets scope it!
DIY Tech & Repairs
We take a look at how it looks when an ATS switches and how the MPI hybrid from MPP solar does its switching -- More information below! --
3 questions need answer.
- How long time does it take for an ATS to switch
- How does it look when MPI hybrid from MPP solar switch?
- Does the MPI hybrid sync with grid for proper switching?
Answers:
- Roughly 10ms
- It looks good!
- Yes it does and rather fast too!
The MPI hybrid version will be back in store September 25th 2017 regarding to MPP solar. I will add up links when that is true.
ATS or automatic transfer switch is perfect for your solar system. It makes it possible to switch between different sources.
Links (Ebay) Contactors https://goo.gl/9xwtwc (EU version 230V) https://goo.gl/svXcwf (US version 120V) 1-0-2 Switch https://goo.gl/gPMvVT Din/Norm changeover switch https://goo.gl/EFCzhi
Controller for above contactor: https://goo.gl/Tzpr4Z
My website: http://diytechandrepairs.nu/ Powerwall forum: https://goo.gl/gBFLJE BMS i use from Batrium: https://www.batrium.com/
Want to help me out or if you appreciate what i do?
Patreon: https://www.patreon.com/DIYtech paypal@romer.se / https://www.paypal.me/diytechandrepairs
By buying the stuff i link to will also yield some extra for me.
286181045 Bytes